FYI------ All, Please see the notice below from Physical Facilities regarding a chilled water shutdown scheduled from Monday, November 28^th to Friday, December 2^nd . This will affect several campus buildings, including ARMS. Some areas of the facility may experience fluctuations in temperature during this time. Thanks, Phil Qualio Building Deputy Neil Armstrong Hall of Engineering Potter Engineering Center 765.496.9757 — 765.494.7020 *From:*Kult, Larry E *Subject:* ARMS, LAMB, CQE, CQNE, CQNW, CQS, MACK, BRES, & STDM Chilled Water Shutdown imap://bystrom@materials.ecn.purdue.edu:993/fetch%3EUID%3E/INBOX%3E44871?part=1.2&filename=image003.jpg PHYSICAL FACILITIES *FR:*Larry Kult *DA:*November 11, 2016 *RE: *ARMS, LAMB, CQE, CQNE, CQNW, CQS, MACK, BRES, & STDM Chilled Water Shutdown *Building(s) Affected:* ARMS (Armstrong (Neil) Hall of Engineering), LAMB (Lambert (Ward L.) Classrooms, Offices and Gymnasium), CQE (Cary (Franklin Levering) Quadrangle (East)), CQNE (Cary (Franklin Levering) Quadrangle (Northeast)), CQNW (Cary (Franklin Levering) Quadrangle (Northwest)), CQS (Cary (Franklin Levering) Quadrangle (South)), MACK (Mackey (Guy J.) Arena), BRES (Drew and Brittany Brees Student-Athlete Academic Center), & STDM (Ross-Ade Stadium) *Utility Shutdown Notice:*This notification is for a chilled water shutdown at ARMS, LAMB, CQE, CQNE, CQNW, CQS, MACK, BRES, & STDM. Chilled water valves near Armstrong Hall of Engineering will be shut off. The purpose of this shutdown is to facilitate construction activities associated with the LFCW-Chilled Water Distribution Valve Replacement and /LFCW-Chilled Water Valves and Isolation Kit Installation projects./ *Date/Time of Shutdown:*7:00am Monday, November 28, 2016 to 8:00pm Friday, December 2, 2016 *Shutdown Requestor/Contact: *Larry Morgan, morganl@purdue.edu <mailto:morganl@purdue.edu>, 765-494-7158