The MSEE building will have no power on Saturday, January 10 starting at
8am and should be back on by noon (12pm).
ECN maintained equipment in MSEE 214 will be shutdown starting at 7:30am
and turned on when the power comes back.
If you have equipment in the room that is not ECN maintained, you will be
responsible for powering it off before the outage. If you email
esite(a)ecn.purdue.edu with a list of machines you want back on after the
power is back on, we will push power buttons.
--andy.