[Bmeroundtable-list] MJIS Chilled Water Shutdown - Round TWO
15 Mar
2022
15 Mar
'22
10:12 a.m.
MJIS chilled water will be shut down again on Thursday, March 17 from 9:00-10:30 a.m. Buildings affected include MJIS, FLEX, DLR, HOCK and HLAB PLUS (newly added) Lily Hall LSPS, LSR, LSA, AAPF, CRTN/LOLC, DRUG, ABE and LYLE This will cause temperature fluctuations within the buildings noted, so be prepared to dress flexibly! -- Bmeroundtable-list mailing list Bmeroundtable-list@ecn.purdue.edu https://engineering.purdue.edu/ECN/mailman/listinfo/bmeroundtable-list
1594
Age (days ago)
1594
Last active (days ago)
0 comments
1 participants
participants (1)
-
Gelfand, Johanna K