MJIS chilled water will be shut down again on Thursday, March 17 from 9:00-10:30 a.m.

Buildings affected include MJIS, FLEX, DLR, HOCK and HLAB PLUS (newly added) Lily Hall LSPS, LSR, LSA, AAPF, CRTN/LOLC, DRUG, ABE and LYLE

 

This will cause temperature fluctuations within the buildings noted, so be prepared to dress flexibly!