Fwd: FW: ARMS, LAMB, BRES, MACK, STDM, CQE, CQNE, CQNW, CQS, CQW & FORD, Chilled Water Shutdown
FYI------ All — please see the notice below from Physical Facilities regarding a *chilled water shutdown* that will affect ARMS, from *Monday, May 30 – Thursday, June 2*. I have been told that we should expect some minor fluctuations in building temperature during those four days. Please plan accordingly. Thanks, Phil Qualio Building Deputy Neil Armstrong Hall of Engineering Potter Engineering Center 765.496.9757 — 765.494.7020 *From:*Kult, Larry E *Sent:* Thursday, May 26, 2016 3:16 PM *Subject:* ARMS, LAMB, BRES, MACK, STDM, CQE, CQNE, CQNW, CQS, CQW & FORD, Chilled Water Shutdown PHYSICAL FACILITIES ENERGY AND CONSTRUCTION *FR:*Larry Kult *DA:*May 26 2016 *RE: *ARMS, LAMB, BRES, MACK, STDM, CQE, CQNE, CQNW, CQS, CQW & FORD, Chilled Water Shutdown (rescheduled) *Building(s) Affected:* ARMS (Armstrong (Neil) Hall of Engineering), LAMB (Lambert (Ward L.) Classrooms, Offices and Gymnasium), BRES (Drew and Brittany Brees Student-Athlete Academic Center), MACK (Mackey (Guy J.) Arena), STDM (Ross-Ade Stadium), CQE (Cary (Franklin Levering) Quadrangle (East)), CQNE (Cary (Franklin Levering) Quadrangle (Northeast)) CQNW (Cary (Franklin Levering) Quadrangle (Northwest)), CQS (Cary (Franklin Levering) Quadrangle (South)) CQW (Cary (Franklin Levering) Quadrangle (West)) Ford Dinning Court *Utility Shutdown Notice:***This notification is for a chilled water shutdown at ARMS, LAMB, BRES, MACK, STDM, CQE, CQNE, CQNW, CQS, and CQW. This is an emergency shutdown to additional buildings due the failure of existing valves for buildings associated with a chilled water shutdown notice dated 5/13/2016 at FORD and CQW. This work is associated with the /Chilled Water Valves and Isolation Kit Installation project/. *Date/Time of Shutdown:*5:00pm Monday May 30, 2016 to 5:00pm Thursday June 2, 2016 *Shutdown Requestor/Contact: *Joseph Arnett, jaarnett@purdue.edu <mailto:jaarnett@purdue.edu> , 494-9409
participants (1)
-
Donna Bystrom