Next Saturday, September 30, there is a planned power outage in MSEE that will affect the MSEE 214 server room. The power will be out starting at 6am and is scheduled to last until noon. Likely the power will be restored before noon. ECN supported equipment will be powered down starting at 5:30am. Any self maintained systems need to be turned off before 6am. Thanks, --andy.
This is a reminder of the power outage happening tomorrow morning. Power will be out at 6am. ECN maintained systems will be shut down starting at 5:30am. I will send another email when power is restored. --andy. On Fri, Sep 22, 2017 at 9:03 AM, Andrew Sydelko <sydelko@purdue.edu> wrote:
Next Saturday, September 30, there is a planned power outage in MSEE that will affect the MSEE 214 server room. The power will be out starting at 6am and is scheduled to last until noon. Likely the power will be restored before noon.
ECN supported equipment will be powered down starting at 5:30am.
Any self maintained systems need to be turned off before 6am.
Thanks,
--andy.
The power and air conditioning was turned back on at 12:30pm. ECN maintained systems should be back on now. Please report any issues to esite@ecn.purdue.edu --andy. On Sep 29, 2017 2:51 PM, "Andrew Sydelko" <sydelko@purdue.edu> wrote:
This is a reminder of the power outage happening tomorrow morning. Power will be out at 6am. ECN maintained systems will be shut down starting at 5:30am.
I will send another email when power is restored.
--andy.
On Fri, Sep 22, 2017 at 9:03 AM, Andrew Sydelko <sydelko@purdue.edu> wrote:
Next Saturday, September 30, there is a planned power outage in MSEE that will affect the MSEE 214 server room. The power will be out starting at 6am and is scheduled to last until noon. Likely the power will be restored before noon.
ECN supported equipment will be powered down starting at 5:30am.
Any self maintained systems need to be turned off before 6am.
Thanks,
--andy.
participants (1)
-
Andrew Sydelko