All-
SL 3rd Floor West Side (only)- Domestic Hot and Cold, Compressed Air, Natural Gas, Deionized Water, Hot Water Heat System and Vacuum System Shutdown – April 25-Confirmed
On Saturday, April 25, 2026, from 6:00 AM to 3:30 PM, installations of new isolation valves will take place on the 3rd floor of SL in the West side at rooms SL338, 340, 342, 347, 351, and 369. The purpose of installing these isolation valves is to allow for fewer disruptions during ongoing renovations.
This work involves the following:
- Domestic Hot Cold Water
-Compressed Air
-Deionized Water
-Natural Gas-
- Vacuum systems. T
Angel Campbell
School of Science, Dean’s office
EL 130
317-274-0631