Dear all,
FYI, On Dec 6th @8am, all BSC’s in labs 4107A, 4118A, 4118B, and 4117B will be inspected and re-certified, so we will have a few people from REM and/or contractors in the LORRE labs.
I will make sure the BSC’s are completely empty and clean (sterilized) by Dec 5th afternoon, and will be out of service on Dec 6th. So, if you use the BSC’s,
please plan your experiments around that schedule. Reminders: as always, If the BSC’s have a hose connected to the vacuum line, make sure there is a 0.2um in-line filter connected to the hose. Also, the BSC’s must have ethanol 70% spray bottle right
beside them.
Thank you,
Fernanda