From: Qualio, Phillip H
Sent: Tuesday, September 09, 2014 10:35 AM
To: Beck, Kaethe A; Cadwallader, Teresa L; Carie, Carla S.; Connell, Heather A; Dellinger, Leza R; Deputy, Dianna L.; Haas, Rachel Luann; Long, Russell A; Moore, Terri R.; Pawley, Alice L; Purzer, Senay; Reece, Kellie A; Diwakar, Prasoon Kumar; Shade,
Steven A
Cc: Frost, Eric A
Subject: FW: POTR, NUCL Chilled Water Shutdown
All,
As indicated below, Physical Facilities will be shutting down the chilled water supply to Potter on
Monday, September 15, and Tuesday, September 16.
This will affect the building’s cooling system. Thankfully, with the weather we’ve been having, it should hardly be noticeable.
Thanks,
Building Deputy
Neil Armstrong Hall of Engineering
Potter Engineering Center
765.496.9757 — 765.494.7020
From: Kult, Larry E
Sent: Monday, September 08, 2014 4:50 PM
Subject: POTR, NUCL Chilled Water Shutdown
PHYSICAL FACILITIES
ENERGY AND CONSTRUCTION
FR:
Larry Kult
DA:
September 8, 2014
RE:
POTR, NUCL Chilled Water
Shutdown
Building(s) Affected: POTR(Potter (A.A.) Engineering Center), NUCL(Nuclear
Engineering Building)
Utility Shutdown Notice:
This notification is for a complete chilled water shutdown at POTR and NUCL. The purpose of this shutdown is to reroute existing chilled water lines currently located on the Active Learning
Center construction site. This work is associated with the Active Learning Center Utilities Make Ready Package – 2014 project.
Date/Time of Shutdown:
7:00am Monday September 15, 2014 to 4:00pm Tuesday September 16, 2014
Shutdown Requestor/Contact:
Jim Mellish,
jwmellish@purdue.edu, 765- 494-0590