BE ADVISED -  The hot water on the addition side of the building had some repairs made which required the system to be shut down for a period of time. When the valves are opened back up and the pressure

increases, the result is deposits inside the pipes break loose and need to be cleared. They are in the process now of flushing out the system to clear all the lines of any discolored water. This will take some time so please be patient as they put the system back into operation. If you have any questions please contact us. Thank you.

 

Jeff Valley