All, Next week, in preparation of our fall shutdown and UPS replacement, we will be switching power sources to a select few building control panels. This will occur next Monday - Wednesday (10/8/2018 - 10/10/2018) in the morning, which will cause temporary power loss to the AWN, PCW, and process cooling water. During the power swap we don't anticipate any issues with normal building operations due to the short nature of the power being off, but there's always a chance something could occur. Once all the panels have been changed to their new power sources I will send a follow-up email. Thanks. William (Wil) Arnett Facility Engineer Birck Nanotechnology Center | Room 1120 | Office: 765.496.8329 | Email: arnettw@purdue.edu<mailto:arnettw@purdue.edu> Wiki: https://wiki.itap.purdue.edu/display/BNCWiki iLabs: https://purdue.ilabsolutions.com/homepage/ ______________________________________________________________ [DP-BirckNanotechCtr-H-BG-RGB]
All, The select building control panels have been successfully transferred to new power sources in preparation of next week. All related building functions are operating under normal conditions. Thank you. William (Wil) Arnett Facility Engineer Birck Nanotechnology Center | Room 1120 | Office: 765.496.8329 | Email: arnettw@purdue.edu<mailto:arnettw@purdue.edu> Wiki: https://wiki.itap.purdue.edu/display/BNCWiki iLabs: https://purdue.ilabsolutions.com/homepage/ ______________________________________________________________ [DP-BirckNanotechCtr-H-BG-RGB] From: Arnett, William A Sent: Wednesday, October 03, 2018 4:14 PM To: BNC-facility-notice@ecn.purdue.edu Cc: Voorhis, Mark L. <mvoorhis@purdue.edu>; Lane, Michael S <mslane@purdue.edu>; Sprowl, Scot W <swsprowl@purdue.edu>; Laorange, Greg A <galaorange@purdue.edu>; Arnett, William A <arnettw@purdue.edu> Subject: Changing Building Control Panels All, Next week, in preparation of our fall shutdown and UPS replacement, we will be switching power sources to a select few building control panels. This will occur next Monday - Wednesday (10/8/2018 - 10/10/2018) in the morning, which will cause temporary power loss to the AWN, PCW, and process cooling water. During the power swap we don't anticipate any issues with normal building operations due to the short nature of the power being off, but there's always a chance something could occur. Once all the panels have been changed to their new power sources I will send a follow-up email. Thanks. William (Wil) Arnett Facility Engineer Birck Nanotechnology Center | Room 1120 | Office: 765.496.8329 | Email: arnettw@purdue.edu<mailto:arnettw@purdue.edu> Wiki: https://wiki.itap.purdue.edu/display/BNCWiki iLabs: https://purdue.ilabsolutions.com/homepage/ ______________________________________________________________ [DP-BirckNanotechCtr-H-BG-RGB]
participants (1)
-
Arnett, William A