BIRCK NANOTECHNOLOGY CENTER http://www.purdue.edu/discoverypark/resources/toolkit/files/logo/digital/Logo-949x222.png

 

Seminars/Workshops

 

Jonathan Fan Seminar

High Performance Meta-optical Systems for Extreme Waveform Control

April 25th  @ 11:00am in BRK 1001

https://www.purdue.edu/discoverypark/birck/events/index.php?view=1506

 

Gregory Sotzing Seminar

Organic Conductive Polymers for Wearable Electronics

May 2nd  @ 11:00am in BRK 1001

https://www.purdue.edu/discoverypark/birck/events/index.php?view=1509

 

PQC distinguished Seminar – Dirk Englund Seminar

Semiconductor Quantum Technologies for Secure Communications and Scalable Quantum Networks

May 4th  @ 2:00pm in BRK 2001

https://www.purdue.edu/discoverypark/birck/events/index.php?view=1507

 

See other Discovery Park’s Events:

http://www.purdue.edu/discoverypark/events/index.php

 

 


Birck Nanotechnology Center PM Shut Down Notice

 

The Birck Nanotechnology Center will be undergoing a semi-annual preventive maintenance and service shutdown April 30 through May 4, 2018.  Air handling systems, exhaust systems, toxic gas delivery, and monitoring systems will be down beginning at 7 a.m. Monday, April 30 through 4 p.m. Friday, May 4.  The BNC staff will be performing appropriate preventive maintenance on the process equipment at this time as well. 

 

All CLEANROOM research work will be suspended until the maintenance activities are completed and all systems are returned to normal.  Only authorized personnel will be allowed to enter the cleanroom during this time period.

 

In addition, the laboratory areas will also be affected by this systems maintenance.  As such, all LABORATORY activities that involve exhausted hoods, vacuum systems, and/or toxic gas systems will be down beginning 7 a.m. Monday, April 30 through 4 p.m. Friday, May 4.  However, work that involves taking standard electrical measurements may be carried out in the LABS provided that fluctuating air temperature and humidity do not affect the readings.  No chemical work will be allowed during this period.

 

It is anticipated that the building and process tool maintenance will be completed by the end of the day on Friday, May 4.  Please check iLabs for equipment status and availability.

 

For long term research planning please refer the following future dates for our future preventive maintenance shutdowns.

      Week of Oct 15, 2018 Week of April 29, 2019

      Week of Oct 14, 2019 Spring  May 4, 2020

 

Thank you for your cooperation and understanding during these important preventive maintenance shutdowns.

Mark Voorhis

Building Manager

Birck Nanotechnology Center

 

 

 


Do not store items under desks

 

I would like you to please refrain from storing your items under your desk.  Our custodial crew needs to keep the floors clean and are not allowed to touch any personal items.  Could you please Use the shelves above your desk to store these items?  If you have any questions, please call me at 6-1173. 

Mary Jo

 

 

 


Kitchen Refrigerator Clean-out

 

Notice:  The kitchen refrigerator will be cleaned out on Wednesday April 25 at 2PM

At that time anything that is not labeled and/or looks bad to me will be trashed. Container and all.

 

Please label your food if you do not want it trashed.

 

Thank you

 

Nancy Black

Secretary V

Birck Nanotechnology Center

West Lafayette, IN 47907-2057

Phone: 765-494-8675

Fax: 765-494-4731

 

 

 


Aspire Four Week Look Ahead Schedule

 

Attached is the Aspire Four Week Look Ahead Schedule.  It is the projection of vibration and/or noise issues with the construction outside of Birck.